OK so here r some pics of a basement remodel job i did this summer. The basement was partially done b4, with boiler / storage area separated and office added.
The goal was to make the rest of the basement into completely finished space.
It involved moving W/D hookup/drain, gas line modification, framing in new back wall with W/D enclosure, sheet rock , cover center beam and exposed drain with frame/ sheet rock. Suspended ceilings, Barn wood accent wall and wrap support columns with Barn wood. The wood came from the customer’s barn, which is to be sold and moved. Trimming done after customer installed the vinyl floor. They also did all the painting.
If you compare the shot with the doors open to the picture farther away, you can see the joists b4 the suspended ceiling went in. The smaller door leads to the boiler / storage area. Also see how the enclosure of the center beam is wide on the empty side? Drain pipe covered with the center beam. The other door on the right leads to a Bilco outside entrance. That side gets a Ping Pong table.
More later.